Kerry N70 Pilot Delineation Works

Location N70 Kerry
Client Kerry County Council
Engineer ARUP
Status Complete
Start Date Mid February 2013
End Date April 2013
Value €330,000
 

Description of the Works:

The N70 Pilot Delineation Project comprises the construction of Boundary Treatment Works and Pull-in Areas at 4 pilot locations on the N70 Ring of Kerry over a 2km length to include the following: Construction of high containment kerbing – Insitu kerbing

  • Reflective painting on same
  • Footpath reinstatement
  • Construction of a raised verge
  • Construction of hazard markings
  • Construction of new unreinforced and reinforced stone walls
  • Increasing the height of existing walls
  • Construction of a concrete footpath
  • Removal of existing concrete barrier
  • Supply and installation of regulatory and warning signage.
  • Installation of road markings and road studs
  • Construction of road pavement in pull-in areas   

As part of the works - road stabilisation works were carried out -Piling works along the section of road to be stabilised were carried out. The works involved the placing of 11no 600mm diameter piles along the roads edge. After the piles were placed a retaining wall was construction to stabilise the road

Traffic management was designed, implemented and monitored by P&D Lydon. Roads were kept open to live traffic during the road works.

 