Maynooth Train Station Campus – South; Car Park Extension

Project Description P&D Lydon constructed a new carpark facility between the existing railway line (Maynooth-Dublin line) and adjacent housing estate on the southern side of the existing rail platform. The works required large precast concrete L Wall units to be installed in close proximity to the existing large block work retaining wall to alleviate the […]
Keel, Achill ESB Ducting

Project Description This project was part of the ESB National Trenching & Ducting Framework 2015-2021, of which P&D Lydon had successfully qualified for. The proposed project was located on the northern side of the R319 Mulranny-Keem road. This area is a Special Area of Conservation. A screening assessment was carried out in advance of the […]
Garryowen ESB Upgrade

Project Description P&D Lydon were contracted by the ESB to install 3km of trench (6-way 38kVA ducting) within the urban environment of Limerick City at Garryowen to Southhill. Client – Limerick City & County Council Project Timeline – December 2018 – October 2019 Role – Main Contractor PSCS The scope of the project included: Trench […]
ESB Ducting Smithstown Industrial Estate, Shannon

Project Description These works involved the excavation & laying of over 1.4km of ESB ducting through the busy live industrial & residential areas of Smithstown, Shannon. P&D employed their traffic management strategy to ensure that all vehicles and pedestrians had access to the area all the time. Client – ESB Networks & Clare County Council […]
N5 Westport-Castlebar 38KV Cable Diversion Carrowbeg

Project Description This project was part of the new N5 dual carriageway from Castlebar-Westport. Works involved the diversion of the existing 38KVA cables, and MV/LV cables located along the proposed route of the new road. Works involved the excavation & laying of over 1.8km of ESB ducting in and around the grounds of Allergan and […]
Achill Island ESB Works

Project Description This project involved the removal of approximately 70 metres of concrete surrounding the submarine cable between High water mark and low water mark on Clare island beach. The concrete was removed from the submarine cable on the beach section using a hydraulic breaker, involving the switching out of the cable to facilitate this. […]
Caherdavin 38KVA ESB Ducting & Civils Works

Project Description These works involved the excavation & laying 1km of double circuit 38KVA 125mm ESB Ducting and 1.2km of single circuit 38KVA ESB Ducting including comms ducting through the busy urban city centre environment of Caherdavin. P&D Lydon were required to carry out the works while maintaining access at all times for vehicles and […]
North Connaught 110 kV Project – Swinford Town Advance Ducting Works

Project Description The Swinford Town Advance works required a new ESB ducting along Davitt Place, starting near the Courthouse, down and onto Kilkelly Rd (R375) for approx. 950m and down to about 100m from the N5. Works started at the Davitt Place end and progressed daily along the route with each piece completed and closed […]